The Madison Building, The Mall, Middlesborough
Architect:
Comprehensive Design Architects
Est. Build Costs:
TBA
We have been instructed by our Client to consider the feasibility of converting an old night club into retail units.
Symmetrys’ works have included reviewing existing reports highlighting various areas within the building which have High-Alumina Cement (HAC) Concrete. Symmetrys have outlined further tests that are necessary to clarify the extent of the HAC Concrete prior to developing a structural scheme for the refurbishment works.

